The Santiago Bernabéu's Retractable Roof, Explained
The Bernabéu's retractable roof covers the pitch in any weather and cuts noise for neighbours. Here's what finished, what's left, and why it stays shut.

The Bernabéu's renovation is structurally finished, with a retractable roof, a new facade and a bigger east stand. Only catering fit-out and acoustic work remain, slated for the 2025/26 financial year. The roof itself usually stays closed to cut noise for neighbours.
Santiago Bernabéu Stadium Entry Ticket From $40.58 · Cheapest way to see the stadium on your own See dates On this page 6 sections
Is the Bernabéu stadium finished? Structurally, yes. The multi-year renovation that gave the stadium its roof and new facade is complete, with only interior fit-out work left to close out. I’d go into a 2026 visit expecting a finished building, not a construction site.
The renovation, by the numbers
Source:esMadrid and DezeenIs the Santiago Bernabéu stadium finished?
Mostly, yes. The club says the structural work is complete, with attention now on commercial assets that turn the stadium into a year-round events venue rather than on construction itself.
What’s genuinely left is smaller than the headline work: certain catering activities and acoustic improvements for concerts are scheduled for the 2025/26 financial year. None of that affects the stadium tour route.
What did the renovation actually add?
A lot more than a new roof, though that’s the headline feature. The build added a retractable roof, a stainless-steel louvre facade, a taller east stand, roughly 3,000 extra seats, a new food hall and a six-level underground system for storing the pitch.
GMP Architekten led the design, working with Spanish studios L35 and Ribas & Ribas to turn the ground into a venue that can host far more than football.
Why is the Bernabéu roof usually closed?
Weather isn’t the main reason. Madrid’s own tourism board says the roof lets the pitch be used in any weather and also helps reduce acoustic impact for local residents, which explains why it stays shut on plenty of clear nights too.
Say you’re planning a Saturday visit and picturing an open-roof photo of the pitch under the sky: I’d set that expectation aside. The roof’s day-to-day job is managing noise for the neighbourhood, not chasing sunshine, so a closed roof on a nice day isn’t unusual.
“The retractable roof allows the pitch to be used in any weather and also helps reduce acoustic impact for local residents.”
esMadrid, Madrid's official tourism website, 2026 · source
Did the renovation change the seating capacity?
The numbers in circulation don’t fully agree, because they describe different stages of the build. Dezeen reports a 3,000-seat increase on the old roughly 80,000 capacity, while esMadrid’s own figure for the finished bowl is 80,242, one seat fewer than before the works started.
| Source | Reported capacity | What it describes |
|---|---|---|
| esMadrid (official tourism board) | 80,242 | Finished bowl, current |
| Dezeen | Old capacity plus 3,000 seats | Net change from the renovation |
| Wikipedia (companion capacity page) | 83,186 | 2024 figure, a separate count |
Can visitors see the whole stadium today?
Yes, on any non match day. The museum, panoramic viewpoint, dressing rooms and benches are all open, and the stadium’s new food hall near Gate 54 is one of the more recent additions to the visit.
If you’re weighing whether to add a guide, the stadium capacity and facts page covers the full modern layout, and the name’s own history explains why the ground carries Bernabéu’s name at all. The retractable pitch system underneath it is the other half of this same renovation story.
Questions
Who designed the renovated stadium?
GMP Architekten led the design, working with Spanish firms L35 and Ribas & Ribas on the overall transformation of the stadium.
What is the new food hall at the Bernabéu?
It’s a dedicated food hall reachable through Gate 54, unveiled on 4 November as part of the renovation’s later-stage additions.
Are the dressing rooms open on every visit?
No. They close on match days and the day before, along with the pitch level benches, while the museum and panoramic view stay open regardless.
Did the renovation add a skywalk?
Not under that name. The closest equivalent is the panoramic viewpoint high in the stands, which gives visitors an elevated view over the pitch and the stadium’s new roof structure.


